Modifier 57
Example: An evaluation on the day before or the day of a major operation that led to the decision to operate
Approach: The clinic visit is marked as the decision visit when the case is booked from it
A surgical case touches the clinic, the hospital and the billing team, and a missing consent or an outdated history can stop it at the door. Agnotic Technologies builds general surgery software that carries each case from booking to the end of its global period.
Trusted by global innovators
























General surgery software
General surgery software runs a surgical case from booking to the end of its global period: block time and case scheduling, surgeon preference cards, the pre-op record, operative notes and billing for the procedure and follow-up. Agnotic Technologies builds general surgery software for surgical practices and hospital departments, connected to the hospital EHR.
Most of the clinical record lives in the hospital EHR. The gaps sit between systems: the practice books a case the hospital has not scheduled, the consent is signed on paper, or a follow-up visit is billed when it is part of the global package.
This page covers the general surgery workflow. Ambulatory surgery center operations and operating room system comparisons are separate topics, and practice management across specialties is on our practice management software page.
Pre-incision checklist
The checklist behind the pre-op screen. Hospital rules come from the Medicare conditions of participation for surgical services; site marking and the time-out follow the Joint Commission Universal Protocol as your hospital adopts it.
| Before incision | Rule that requires it | Field that captures it |
|---|---|---|
| Current history and physical | Completed no more than 30 days before or 24 hours after admission or registration (42 CFR 482.51(b)(1)(i)) | H&P date and author pulled from the EHR, with the 30-day window shown on the case |
| Updated examination | Within 24 hours after admission when the H&P was done in the prior 30 days (482.51(b)(1)(ii)) | H&P update note linked to the case, flagged when missing on the day of surgery |
| Informed consent | A properly executed consent form for the operation in the chart before surgery, except in emergencies (482.51(b)(2)) | Signed e-consent with procedure, side, surgeon and witness, matched to the scheduled case |
| Site marking | Marking of the procedure site under the hospital's Universal Protocol policy | Who marked the site, when, and the side, matched to the consent and the schedule |
| Time-out | A final check of patient, procedure and site before incision under the same policy | Time-out record with each team member's confirmation and the time |
| Surgeon privileges | Surgical privileges delineated for every practitioner, with a roster kept (482.51(a)(4)) | Privilege list checked at booking, so a case cannot be scheduled outside it |
Your hospital's policy may add items such as an anesthesia assessment or implant checks; we add them to the same screen during scoping.
Case flow
One case, from the clinic decision to the last routine post-op visit.
The surgeon records the decision in clinic, and the visit is coded so the decision visit bills correctly.
The practice requests a slot in the surgeon's block or in open time, with procedure, side, expected duration and equipment.
History and physical, labs, consent and any clearance letters are collected against the case, with gaps shown to the scheduler.
Site marking and the time-out are recorded, the preference card is shown to the team, and implants and supplies are scanned.
The surgeon completes a structured op note right after surgery and signs it.
Post-op visits are scheduled and tracked as part of the package, and anything outside it is flagged for the right modifier.
Modules for the surgical case, each shaped by how surgeons, schedulers and billers hand work to each other.
Block release rules, open time requests and case booking that checks surgeon privileges, room and equipment before a slot is requested.
Instruments, supplies, positioning and setup per surgeon and procedure, versioned, with nurses able to propose changes after each case.
History and physical dates, consent, labs, clearances and site marking tracked on each case, with day-of-surgery gaps highlighted.
Structured fields for procedure, findings, specimens, implants, estimated blood loss and complications, plus free text where surgeons need it.
Each case linked to its global period, so post-op visits inside it are not billed separately and separate services carry the right modifier.
Follow-up visits, wound checks and patient messages scheduled from the date of surgery, with missed visits flagged.
Global period modifiers
These CPT modifiers decide whether a visit or procedure around surgery is paid separately. The software asks for them at the moment the work is documented, not when the claim is rejected.
Example: An evaluation on the day before or the day of a major operation that led to the decision to operate
Approach: The clinic visit is marked as the decision visit when the case is booked from it
Example: A significant, separately identifiable evaluation on the same day as a minor procedure
Approach: The note must hold its own history and exam before the modifier can be added
Example: An unrelated evaluation during the postoperative period
Approach: The visit needs a diagnosis unrelated to the surgery before it can bill outside the package
Example: A staged or planned related procedure during the postoperative period
Approach: Linked to the original case as planned at the time of surgery, and a new global period starts
Example: An unplanned return to the operating room for a related problem
Approach: Linked to the original case, and the original global period carries on
Example: An unrelated procedure during the postoperative period
Approach: Needs an unrelated diagnosis and starts its own global period
Failure points
Problems we design around on every general surgery build.
Challenge
Cases are booked in the practice but not in the hospital's OR schedule.
Agnotic approach
Booking requests go to the hospital through its scheduling interface or a tracked request queue, and the practice sees the confirmed time.
Challenge
The history and physical is older than 30 days on the day of surgery.
Agnotic approach
Each case shows the H&P date and the days left, and schedulers see cases at risk a week ahead.
Challenge
The consent says left and the schedule says right.
Agnotic approach
Procedure and side are entered once at booking and copied to the consent, the site marking record and the op note.
Challenge
Preference cards are out of date.
Agnotic approach
Cards are versioned, nurses propose changes after each case and the surgeon approves them.
Challenge
Post-op visits are billed when they are part of the package.
Agnotic approach
Visits inside the global period are flagged before charges are sent.
Health Insurance Portability and Accountability Act
Protect PHI with privacy-first architecture, encrypted storage and transmission, strict access controls, and traceable audit logs.
General Data Protection Regulation
Implement lawful consent flows, data minimization, retention controls, and secure processing for sensitive health data.
Fast Healthcare Interoperability Resources
Enable standardized health data exchange across apps, care teams, and systems through standards-based FHIR APIs.
Health Level Seven International
Support enterprise-grade interoperability with HL7-based integrations for records, events, and clinical messaging workflows.
Health Information Trust Alliance
Align security programs to healthcare-specific control and risk management practices trusted by providers and ecosystem partners.
Health Information Technology for Economic and Clinical Health Act
Design with breach notification readiness, digital record safeguards, and operational controls that support regulated care programs.
FDA Software as a Medical Device
Plan software quality, traceability, and documentation pathways for products that may require SaMD review and submission.
Medical Device Regulation (European Union)
Prepare EU market-ready processes for risk classification, evidence tracking, and lifecycle governance under MDR expectations.
Substance Abuse and Mental Health Services Administration
Apply confidentiality controls and consent-aware sharing models for behavioral and mental health data experiences.
Codes and standards
Short facts from the surgical services conditions of participation and HIPAA, each linked to its primary source.
Before surgery or a procedure that needs anesthesia, except in emergencies, a hospital must have a medical history and physical examination completed and documented no more than 30 days before or 24 hours after admission or registration, with an updated examination within 24 hours after admission when the history and physical was done in the prior 30 days.
Source: 42 CFR 482.51(b)(1) (eCFR)A properly executed informed consent form for the operation must be in the patient's chart before surgery, except in emergencies.
Source: 42 CFR 482.51(b)(2) (eCFR)An operative report describing techniques, findings and tissues removed or altered must be written or dictated immediately following surgery and signed by the surgeon, and the operating room register must be complete and up to date.
Source: 42 CFR 482.51(b)(5) and (6) (eCFR)Surgical privileges must be delineated for every practitioner performing surgery in line with their competencies, and the surgical service must keep a roster of practitioners specifying each one's surgical privileges.
Source: 42 CFR 482.51(a)(4) (eCFR)The HIPAA Security Rule requires administrative, physical and technical safeguards for electronic protected health information.
Source: 45 CFR Part 164 Subpart C (eCFR)Who it is for
Surgical teams whose cases cross the clinic, the hospital and billing.
Groups operating at one or more hospitals who need booking, pre-op tracking and global period billing in one place.
Department tools for block time, preference cards and op note templates that sit beside the hospital EHR.
Surgical service lines across locations, with shared scheduling and reporting.
Startups building surgical scheduling, consent or follow-up products who need HIPAA-ready engineering.
Scope and cost
We do not publish prices. These are the things that change the size of a build, and we price them on the scoping call.
How many hospitals you operate at, and how each one exposes scheduling, documents and results.
Booking only, or the pre-op checklist, op notes and global period billing as well.
E-consent, witnesses, interpreters and how copies reach the hospital chart.
Your practice management system or a clearinghouse connection we build.
Pre-op instructions and post-op check-ins by text, email or app.
Preference cards, templates and open cases carried over from the current system.
We follow one real case end to end before we build.
We trace one case from the clinic decision to the last post-op visit with your surgeons, schedulers and billers.
ScopeBooking, the pre-op checklist and global period tracking for one surgeon group at one hospital, with weekly demos.
BuildMore hospitals, op note templates, preference cards and billing connections, with support after launch.
Scale