    Software requirements documents: what to specify before you build

    A requirements document is the brief every estimate, design and test is built from. This page lays out the sections one needs, what goes in each and an example line for each, from how Agnotic Technologies scopes builds with clients in discovery.

    For founders, product owners and engineering leads about to brief an in-house team or a development partner.

    What goes in a software requirements document?

    A software requirements document states what a system must do and the conditions it must meet: purpose and scope, users and roles, user stories with acceptance criteria, data and retention, integrations, non-functional and compliance requirements, assumptions and traceability. ISO/IEC/IEEE 29148 describes this content. Agnotic Technologies writes it with clients during discovery.

    Last reviewed by the Agnotic Technologies engineering team

    Why do requirements documents fail the team that builds from them?

    Most documents are long enough. The trouble is what they leave out, or say in a way nobody can test.

    1. Solutions written as requirements

      "Add a dropdown for status" fixes the design before anyone has said what the user needs to decide.

    2. No acceptance criteria

      A story without criteria means the developer, the tester and the client each decide separately when it is done.

    3. Non-functional needs left to the end

      Speed, uptime, accessibility and security are raised after the build, when meeting them means rework.

    4. Integrations listed by name only

      "Integrates with the EHR" hides the direction, the standard, the owner and who grants access, which is where the effort sits.

    5. No out-of-scope list

      Without it, every reader fills the gaps with their own expectations, and the scope grows quietly.

    6. No change control

      The document is right on the day it is signed and wrong a month later, because changes live in chat threads.

    What do we build from a requirements document?

    Agnotic Technologies writes the requirements with you in discovery, then builds the software against them, to your requirements. These are the parts we typically deliver.

    • Backlog with acceptance criteria

      Each requirement becomes stories with testable criteria, in your tracker, ordered by release.

    • Traceability from requirement to test

      Every requirement ID linked to the stories, code changes and tests that cover it, so gaps show before release.

    • Integration contracts

      An interface sheet per integration and, where we own the API, an OpenAPI description agreed before coding starts.

    • Data inventory and retention rules

      Entities, sources, owners, regulated fields and retention periods, carried into the schema and the deletion jobs.

    • Non-functional test suites

      Load tests, accessibility checks against WCAG 2.2 and security tests that run against the stated targets.

    • Security requirements by level

      Security requirements drawn from the OWASP ASVS at the level the product needs, and verified in testing.

    • Change control workflow

      A change request with impact on scope, tests and release, approved before it enters the backlog.

    Which sections does a requirements document need?

    Ten sections, in the order we write them. Each shows what goes in it and one example line. Keep the numbering: later sections and tests refer back to it.

    1. Purpose, scope and out of scope

      Why the system exists, the problem it solves and the edge of the first release.

      • The business goal and how you will know the release worked
      • What is in the first release, and what is deliberately not
      • Systems the product replaces or must leave untouched
      Example line
      Out of scope for release 1: payments, a native mobile app and data migration from the old portal.
    2. Stakeholders, users and roles

      Who uses the system, who approves it and what each role may do.

      • Each user group with its main goal and how often it uses the product
      • Roles and the actions each may take, written as permissions
      • Who signs off the requirements and who decides on changes
      Example line
      Clinic manager: invites staff, assigns roles and sees reports for their own clinic only.
    3. Workflows and user stories with acceptance criteria

      The main journeys as steps, then stories that each pass or fail a test.

      • One workflow per main journey, including the error and empty states
      • Stories in the form: as a role, I need an action, so that an outcome
      • Acceptance criteria as given, when, then statements a tester can run
      Example line
      Given an expired invite link, when the user opens it, then they see a message and a button to request a new one.
    4. Functional requirements by feature

      What the system must do, grouped by feature, each with a unique ID.

      • One requirement per statement, using "must" for required and "should" for preferred
      • Business rules and calculations written out, with their source
      • Notifications, reports and exports with who receives them and when
      Example line
      FR-12: The system must lock an account after five failed sign-in attempts and email the account owner.
    5. Data: entities, sources and retention

      What the system stores, where each item comes from and how long it is kept.

      • Main entities and their key fields, with the system of record for each
      • Regulated data marked: health, payment, personal or government identifiers
      • Retention and deletion rules, and any data to migrate on day one
      Example line
      Appointment history: kept for 7 years after the last visit, then deleted by a monthly job (client's retention policy).
    6. Integrations

      One entry per interface, because this is where estimates most often go wrong.

      • Direction, trigger and frequency of each exchange
      • Standard or API (for example REST with OpenAPI, HL7 FHIR R4, X12 EDI) and authentication
      • Who owns the other system, who grants access and where the test environment is
      Example line
      INT-3: Send each signed order to the lab system as an HL7 v2 message within one minute; lab vendor provides test access.
    7. Non-functional requirements

      How well the system must work, named with the ISO/IEC 25010 quality characteristics so nothing is skipped.

      • Performance and capacity, stated as a measurable target per key action
      • Availability, backup and recovery targets
      • Security, stated by OWASP ASVS level, and accessibility, stated by WCAG 2.2 level
      • Supported browsers, devices and languages
      Example line
      NFR-4: All patient-facing screens must meet WCAG 2.2 Level AA.
    8. Compliance and regulatory constraints

      The rules the product must meet, written as requirements engineers can build and test.

      • Each regulation or contract clause that applies, and which feature it touches
      • Audit logging, access review and data residency needs
      • Evidence the client needs at release, such as test reports or a security review
      Example line
      CMP-2: Every view of a patient record must be written to the audit log with user, record and time.
    9. Assumptions, dependencies and constraints

      What the plan relies on that the team does not control.

      • Assumptions to confirm, each with an owner and a date
      • Dependencies on other teams, vendors or approvals
      • Fixed constraints: hosting, technology choices, budget or launch date
      Example line
      A-5: The client's identity provider supports OpenID Connect; owner: client IT, confirm by the end of discovery.
    10. Traceability, acceptance and change control

      How each requirement is proven and how the document stays true after sign-off.

      • A trace from each requirement ID to its stories and tests
      • How the release is accepted, and by whom
      • How a change is requested, assessed and approved, and where the history is kept
      Example line
      Change requests are logged with their impact on scope, tests and release date, and approved by the product owner before work starts.

    How do you turn a vague requirement into a testable one?

    Read each requirement and ask how a tester would prove it. These examples show the rewrite; the targets in them are examples, not recommendations.

    Vague requirements and testable rewrites, by area
    AreaVagueTestable rewrite
    PerformanceThe app must be fast.Search results must load within 2 seconds for 95% of requests at the stated peak load.
    AvailabilityThe system should always be up.The patient portal must be available 99.9% of each calendar month, excluding announced maintenance windows.
    AccessibilityThe site must be accessible.All public pages must meet WCAG 2.2 Level AA, checked by automated tests and a manual screen reader pass.
    SecurityData must be secure.The API must meet OWASP ASVS Level 2, and all stored personal data must be encrypted.
    IntegrationSync with the CRM.New leads must reach the CRM within 5 minutes through its REST API, with failures retried and alerted.
    UsabilityEasy to use for staff.A new staff user must be able to book an appointment without help after the 10-minute onboarding.

    Which gaps send a build back to the start?

    These are the omissions we look for first when a client brings us an existing requirements document.

    Integrations without an owner
    Nobody has confirmed who grants access to the other system, so the integration waits weeks for credentials.
    Roles without permissions
    Roles are named but nobody has said what each one may see or change.
    Missing states
    Only the happy path is described; empty, error, offline and expired states are found in testing.
    Data migration forgotten
    The old system's data has to move on day one, and nobody planned how it maps.
    Targets with no number
    "Fast" and "secure" cannot be tested, so they cannot be accepted either.
    Compliance as a footnote
    Rules are listed at the end instead of written into the features they constrain.

    Trusted by global innovators

    Benchmark
    Chibasco
    Fundency
    Lantimer
    Lauren
    Lera
    One Minute
    Pento Pix
    TAP
    Xtrium
    Healthevolve
    Benchmark
    Chibasco
    Fundency
    Lantimer
    Lauren
    Lera
    One Minute
    Pento Pix
    TAP
    Xtrium
    Healthevolve
    Benchmark
    Chibasco
    Fundency
    Lantimer
    Lauren
    Lera
    One Minute
    Pento Pix
    TAP
    Xtrium
    Healthevolve
    Benchmark
    Chibasco
    Fundency
    Lantimer
    Lauren
    Lera
    One Minute
    Pento Pix
    TAP
    Xtrium
    Healthevolve
    Facts and sources

    Which standards help structure the document?

    Short facts from the standards bodies whose work a requirements document can cite, each linked to its primary source.

    • ISO/IEC/IEEE 29148:2018 specifies the processes for requirements engineering across the system and software life cycle, the information items those processes produce and the required content of those items.

      Source: ISO/IEC/IEEE 29148:2018 (iso.org)
    • ISO/IEC 25010:2023 defines a product quality model of nine characteristics, divided into subcharacteristics, that can be used to specify and evaluate requirements for software products.

      Source: ISO/IEC 25010:2023 (iso.org)
    • WCAG 2.2, a W3C Recommendation dated 12 December 2024, defines three levels of conformance: A (lowest), AA and AAA (highest).

      Source: W3C, WCAG 2.2
    • The OWASP Application Security Verification Standard provides a basis for testing web application security controls and a list of requirements for secure development; its latest stable version is 5.0.0.

      Source: OWASP ASVS project

    What can a requirements document not settle?

    Cost and timeline
    An estimate comes from the requirements, but this page gives no prices or durations. We size the work with you in discovery.
    Design
    Requirements say what the system must do. Screens, flows and visual design come later and are tested with users.
    Legal interpretation
    The document records the rules that apply. Whether a rule applies to your product is a question for your compliance advisers.
    Industry detail
    Some products need more, such as an EHR requirements checklist or a clinical workflow map before the stories.

    Software requirements document questions

    A product requirements document (PRD) usually explains the product's goals, users and features for the business. A software requirements specification (SRS) goes further into what the system must do and how well, in a form engineers and testers can work from. Many teams combine them in one document.