    Asset & Work Order Management

    Work Order

    A work order is a task instruction to fix, install, or service something, typically created from an inspection finding or a maintenance schedule. It records what needs doing, who is assigned, and the due date, and stays open until the work is completed and verified.

    Key takeaways

    • Documented instruction to fix, install, inspect, or service an asset
    • Originates from schedules, inspections, or reported problems
    • Tracks assignment, due date, labor, and parts through completion
    • Its data builds the asset history reports depend on
    • Fast mobile closeout drives the data quality everything else needs

    What Work Order means

    A work order is the basic unit of maintenance work: a documented instruction to fix, install, inspect or service something specific. A work order starts from a preventive schedule, an inspection finding or a request, and records the task, asset, owner and due date.

    Work orders move from requested to assigned, in progress and completed, gathering labor time, parts and findings. That record builds each asset's history, so make closeout fast on a mobile device; careless closeouts leave reports and predictive analytics built on sand.

    When does this matter for a software build?

    Work order design matters for a build because the work order is where most of the data in a maintenance system is created, and every report reads from it. Decisions about status values, required closeout fields, failure codes and who can approve or reopen a job shape the whole product. Work orders also become an integration point when they are raised from inspections, sensor alerts or tenant requests, or when they post labor and parts cost to finance.

    What we would check first

    1. How many ways a work order gets raised today, such as schedules, inspection findings, phone calls or email, and which of them bypass the system.
    2. Which fields technicians actually fill in at closeout, and which ones are skipped or left on defaults.
    3. Whether labor, parts and contractor costs need to reach an ERP, and at which status in the work order's life they should post.

    Explore this on Agnotic

    Where Work Order shows up in how we build.

    Frequently asked questions

    A work request is the initial report that something needs attention, often submitted by an occupant or operator who is not part of the maintenance team. A work order is the formal, approved task that a planner creates from that request, with an assignee, priority, and due date. Separating the two lets teams screen and prioritize requests before committing resources.