Empty maintenance control room with a wall screen showing a map with several site markers and side by side bar charts

    Multi-Site Maintenance

    Multi-site maintenance standardization for plants that each report differently

    Every plant codes failures its own way, counts downtime its own way and runs root cause analysis when it has time. Agnotic Technologies builds the software layer that gives all your sites one maintenance standard: shared asset classes, failure codes, PM templates, KPI definitions and one RCA method, on top of the CMMS each site already runs.

    Shared failure codesPM templatesComparable KPIsOne RCA method

    Trusted by global innovators

    Benchmark
    Chibasco
    Fundency
    Lantimer
    Lera
    One Minute
    Pento Pix
    TAP
    Xtrium
    Benchmark
    Chibasco
    Fundency
    Lantimer
    Lera
    One Minute
    Pento Pix
    TAP
    Xtrium
    Benchmark
    Chibasco
    Fundency
    Lantimer
    Lera
    One Minute
    Pento Pix
    TAP
    Xtrium
    Benchmark
    Chibasco
    Fundency
    Lantimer
    Lera
    One Minute
    Pento Pix
    TAP
    Xtrium

    How do we standardize maintenance across all our sites?

    Standardize maintenance across all your sites by agreeing one shared model, which asset classes, failure codes, work order types, priorities, PM templates and KPI formulas every site uses, and then building software that applies it in each site's CMMS or maps each site's local codes onto it. Agnotic Technologies builds multi-site maintenance standardization as that layer: a standard library owned by central reliability, connectors to SAP PM or the CMMS at each plant, mapping rules for codes that differ, and reports that flag sites drifting from the standard. Sites keep running their own work; the data they produce becomes comparable.

    Benchmarking

    How do we compare maintenance between sites when every site reports differently?

    Compare sites only after each metric has one definition and each site's data is mapped to it. Maintenance benchmarking across plants fails on definitions far more often than on data, so this is the table we agree with your reliability team first.

    What you compareWhy sites report it differentlyWhat the shared standard fixes
    DowntimeOne site counts from the breakdown, another from the work order, a third leaves out short stopsOne start and end event, and one minimum duration, for every site
    Failure countsFree-text descriptions, or local code lists of different depthsShared problem, cause and action codes, with local codes mapped to them
    Planned versus reactive workWork order types and priorities named and used differentlyCommon work order types, so the planned share means the same thing
    PM complianceDifferent grace periods and different rules for skipped tasksOne rule for on time, late and missed, applied by the software
    Maintenance costContractor and spare part costs booked to different placesCost elements mapped to one structure per asset class
    Mean time between failuresAssets grouped and named differently at each siteShared asset classes, so like is compared with like

    Site leaders sign off the definitions before any comparison is published. Where a site cannot meet a definition yet, the report says so instead of showing a misleading number.

    Root cause analysis

    How do we make every site run RCA the same way?

    Give every site the same trigger rules, the same steps and the same record, built into the software instead of a slide deck. Root cause analysis software for maintenance then guides each investigation and stores it where other sites can find it.

    1. Trigger

      A failure that meets a shared rule, such as repeat failure, safety impact or long downtime, opens an RCA automatically.

    2. Team

      The investigation names its lead and members, including the site that runs the same asset class if you choose.

    3. Evidence

      Work order history, sensor and CBM data, photos and the failed part are attached before analysis starts.

    4. Analyze

      The team uses the method set for that level, such as 5 Whys, a fishbone diagram or a fault tree.

    5. Act

      Corrective actions become tasks with owners and due dates, and PM template changes go to central reliability.

    6. Share

      The finished RCA is coded by asset class and failure mode, so every site with the same asset sees it.

    RCA levels

    Which failures need a full RCA?

    Not every breakdown needs a full investigation. Shared trigger rules decide the depth, so sites do not each decide alone. The thresholds below are examples your reliability lead replaces with your own.

    01

    Record only

    Example: A single failure with low downtime and a known cause

    Approach: Coded on the work order and trended across sites

    02

    Quick RCA

    Example: A repeat failure on the same asset within your set period

    Approach: A short 5 Whys by the site team, reviewed by the maintenance lead

    03

    Full RCA

    Example: Long downtime, high cost or a failure on a critical asset class

    Approach: A cross-functional team, a structured method and actions tracked to closure

    04

    Safety or process safety event

    Example: An incident with harm, or one that could have caused a serious release

    Approach: Your incident investigation procedure, with the RCA record linked to it

    The standard

    What goes into the shared maintenance standard?

    The library central reliability owns and every site uses.

    Assets

    • Asset classes and hierarchy levels
    • Criticality rules
    • Naming and tagging rules

    Codes

    • Problem, cause and action codes
    • Failure modes per asset class
    • Mapping from each site's local codes

    Work

    • Work order types and priorities
    • PM and CBM templates per asset class
    • Task lists and spare parts

    Measures

    • KPI formulas and event definitions
    • Downtime start and end rules
    • Cost structure

    Different CMMS at each site

    Does every site have to run the same CMMS?

    No. Standardization is about the data model and the method, not the brand of CMMS. Sites on SAP PM can carry the shared codes in their notification catalogs, and sites on another CMMS can keep their local codes while the software maps them to the standard.

    Moving every site to one CMMS can still make sense later, and a shared standard makes that migration easier because the codes and templates are already agreed.

    Failure points

    Why do multi-site standards drift?

    Where standardization programs lose ground, and what the software does about it.

    Challenge

    The standard lives in a document nobody opens.

    Agnotic approach

    The standard is the code list and templates inside the system, not a separate file.

    Challenge

    Sites add their own codes when the list does not fit.

    Agnotic approach

    New codes are requested, reviewed and either added or mapped.

    Challenge

    Benchmarks are argued about instead of acted on.

    Agnotic approach

    Definitions are signed off before reports are published.

    Challenge

    RCAs stay inside the site that ran them.

    Agnotic approach

    Finished RCAs are searchable by asset class across every site.

    Challenge

    PM templates diverge after each local change.

    Agnotic approach

    Local changes are tracked against the central template and reviewed.

    What do we build for multi-site maintenance?

    Modules for central reliability, site maintenance leads and planners.

    Standard library

    Asset classes, codes, PM templates and KPI definitions with version history.

    CMMS connectors

    Work orders, notifications and history read from SAP PM and other CMMS at each site.

    Code mapping

    Each site's local codes mapped to the shared standard, with gaps flagged.

    Cross-site reports

    Benchmarks by asset class and KPI, with data quality shown beside each number.

    RCA workflow

    Trigger rules, methods, evidence and actions, the same at every site.

    Failure pattern search

    AI that finds similar failures and past RCAs across sites for an engineer to review.

    CBM data

    Condition readings from sensors and historians linked to assets and failure modes.

    Drift reports

    Sites, codes and templates moving away from the standard.

    Facts and sources

    Which OSHA rules shape maintenance records and investigations?

    Process safety management rules for inspection records and incident investigations at covered processes, each linked to the eCFR.

    • In processes covered by OSHA process safety management, 29 CFR 1910.119(j)(4) requires inspection and testing procedures that follow recognized and generally accepted good engineering practices, at a frequency consistent with manufacturers' recommendations and good engineering practices, and more often if prior operating experience shows it is needed.

      Source: 29 CFR 1910.119(j)(4) (eCFR)
    • 29 CFR 1910.119(j)(4)(iv) requires each inspection and test on covered process equipment to be documented with its date, the name of the person who performed it, the equipment's serial number or other identifier, a description of the inspection or test and its results.

      Source: 29 CFR 1910.119(j)(4)(iv) (eCFR)
    • For an incident that resulted in, or could reasonably have resulted in, a catastrophic release, 29 CFR 1910.119(m) requires an investigation started no later than 48 hours after the incident and a report that includes at least the date of the incident, the date the investigation began, a description, the factors that contributed and any recommendations.

      Source: 29 CFR 1910.119(m)(1) to (m)(4) (eCFR)
    • 29 CFR 1910.119(m)(5) to (m)(7) require a system to promptly address and resolve the report's findings and recommendations, documented resolutions and corrective actions, and retention of incident investigation reports for five years.

      Source: 29 CFR 1910.119(m)(5) to (m)(7) (eCFR)

    Standards

    Standards we build the shared model around

    ISO 14224ISO 5500129 CFR 1910.119(j)29 CFR 1910.119(m)SAP PM catalogs

    Who it is for

    Operators with several plants and one reliability team

    Groups that need to compare sites and share what each one learns.

    Multi-plant manufacturers

    Similar lines at several sites, with different maintenance histories.

    Process and chemical groups

    Shared asset classes, with process safety records at covered sites.

    Food and beverage groups

    Plants acquired over time, each with its own CMMS habits.

    Utilities and energy operators

    Spread-out assets maintained by regional teams.

    Scope

    What decides the size of a standardization build?

    We do not publish prices. These are the drivers we size on the scoping call.

    Sites and systems

    How many sites, and which CMMS or SAP PM setup each one runs.

    Asset classes

    How many classes the first release standardizes.

    Code mapping

    How far each site's local codes are from the standard.

    KPIs

    Which measures are compared first, and the data each needs.

    RCA workflow

    Trigger rules, methods and how actions reach each site.

    CBM data

    Sensors and historians to connect, if any, in the first release.

    Engagement

    How does a multi-site standardization project run?

    We start with two sites and one asset class, then extend.

    1.

    Scoping call

    We review how two or three sites code failures, measure downtime and run RCAs today.

    Scope
    2.

    First release for one asset class

    A fixed-scope first release: the standard for one asset class, mapping for two sites and the first comparable report.

    Build
    3.

    More sites and the RCA workflow

    More asset classes and sites, the shared RCA workflow and drift reports, with support after launch.

    Scale

    Frequently Asked Questions

    No. Historical codes can be mapped to the standard where the meaning matches, and history that cannot be mapped is shown as unmapped rather than guessed. New work is coded to the standard from go-live.