Challenge
Two revisions of the same procedure sit in different folders.
Agnotic approach
One register holds the approved revision; other copies are links to it.

For quality, safety and operations leads who find old procedures in shared drives, binders and contractor packs. Agnotic Technologies builds document control software that keeps one approved revision of every procedure, gets it read by the right crews and contractors, and shows auditors the record on request.
Trusted by global innovators
























One approved revision
Everyone works from the latest approved procedure when each document has one controlled copy and every other copy is either a live link to it or withdrawn. Document control software keeps procedures, policies, forms, permits and contractor packs in one register, routes each change through review and approval, releases it on an effective date and sends it to the crews and contractors it applies to, who read and acknowledge it. Superseded revisions disappear from every screen and shared folder, and auditors get the revision history, approvals and acknowledgements on request.
Agnotic Technologies builds this as custom software for your organization, connected to the systems that already know who works where. This page covers company-wide controlled documents. For step-by-step instructions on a screen at a production station, see digital work instructions software; for drawings, RFIs and submittals on a building project, see construction document management software.
Crews and contractors confirm a change by reading and acknowledging it in the software before their next shift or site entry. Each document has an audience, such as a site, a role, a crew or a contractor company, and releasing a new revision assigns it to everyone in that audience.
Staff acknowledge on a phone, tablet or site kiosk with their own log-in. Contractor supervisors and their crews get access tied to their company and the work they are on, so a contractor sees the site rules and permits for their job and nothing else. The record shows who acknowledged which revision and when.
Where a change needs more than a read, the acknowledgement can include a short question or a briefing sign-off, and the result goes to your skills matrix software or training records.
Periodic reviews stay on schedule when every document carries an owner and a next review date, and the software reminds the owner and escalates before the date passes. The review period is set per document type by your own procedure.
A review either confirms the document unchanged, with the owner's signature and a new review date, or starts a change that goes through the normal approval route. Changes from incidents, audits or a management of change process can open a review early, with the reason recorded.
On the day, you can show an auditor the current revision of any document, its full history, who reviewed and approved each change, and who in the audience has and has not acknowledged it. Reports can be filtered by site, document type or contractor.
The software also lists documents past their review date and acknowledgements still open, so gaps are found and closed before the audit rather than during it. For audit checklists and findings themselves, see compliance audit automation.
Failure points
Problems we see when controlled documents live in shared drives, binders and email, and what the software changes.
Challenge
Two revisions of the same procedure sit in different folders.
Agnotic approach
One register holds the approved revision; other copies are links to it.
Challenge
A printed copy stays on a notice board after the change.
Agnotic approach
Prints carry the revision and print date, and release lists where controlled prints must be swapped.
Challenge
Contractors start work with last year's site rules.
Agnotic approach
Contractor packs are assigned by company and job, and acknowledged before site entry.
Challenge
Review dates are tracked in a spreadsheet nobody opens.
Agnotic approach
Each document has an owner and a review date, with reminders and escalation.
Challenge
Nobody can say who read the last change.
Agnotic approach
Acknowledgements are recorded per person and revision, with open ones listed.
Challenge
Audit evidence takes days to gather.
Agnotic approach
History, approvals and acknowledgements are reported by document, site or contractor.
Control matrix
A typical starting matrix we configure with your team. Your own procedures decide the roles, triggers and audiences.
| Document type | Approved by | Review trigger | Who acknowledges |
|---|---|---|---|
| Operating procedures | Operations lead and the safety or quality lead | Scheduled review, process or equipment change | Operators and maintenance staff on that unit |
| Policies | Department head and leadership | Scheduled review, change in law or company rule | All staff in scope |
| Forms and checklists | Document owner and quality | Change to the procedure they support | Everyone who fills them in |
| Permit to work templates | Safety lead | Incident findings, new hazard, scheduled review | Permit issuers, receivers and contractors |
| Contractor packs | Contractor coordinator and safety lead | New site rule, new job scope | Contractor supervisors and their crews |
| Emergency plans | Site manager | Drill findings, site change, scheduled review | Everyone on site, contractors included |
Each row can carry its own review period, approval route and audience. The matrix itself is a controlled document.
Who it is for
Organizations where auditors, regulators or customers ask which revision people worked from.
Operating procedures reviewed, certified and updated after each managed change.
Approved procedures with electronic signatures and time-stamped audit trails.
Quality system documents kept current, correct and approved.
Ports, plants and utilities where contractors must read site rules before entry.
One register with site-specific documents, approved centrally.
Document control works best when it knows who works where, from the systems that already hold that data.
Staff log in with your identity provider, so every approval and acknowledgement has a name.
Roles, sites and joiners, so new starters get their documents on day one.
Contractor companies, crews and jobs, so packs reach the right people before site entry.
Acknowledgements and briefing sign-offs recorded against each person.
Existing libraries imported, and links that always open the approved revision.
CAPA, audit findings and management of change that start a document review.
The size of a document control build follows the number of document types and sites, the approval routes, the size of the audience and how they read documents (desk, phone, kiosk or offline), how much of the current library needs migrating, the systems it connects to and whether FDA electronic signature rules apply. We do not publish prices; the first release is scoped on the scoping call.
Most teams start with one site and the documents auditors ask about most, then add contractors and other sites. Contractor onboarding and permits beyond the documents themselves are covered by contractor safety management software.
Rollout
Six steps from the scoping call to old copies withdrawn, one site or department at a time.
We look at your document types, sites, approval routes and audit findings, and agree on a first site.
Each current document gets an owner, a type, an audience and a next review date.
Approval routes, review periods and acknowledgement rules are configured from your own procedures.
Current revisions are imported, and sign-on, HR and contractor lists are connected.
The site switches to the register, and old shared folders and binders are withdrawn.
More sites and contractors follow, and a dry-run audit checks the evidence before the real one.
Standards
US regulations that set how procedures are reviewed, changed, controlled and acknowledged, each linked to the regulation text on eCFR.
OSHA's process safety management standard, 29 CFR 1910.119(f)(3), requires operating procedures to be reviewed as often as necessary to reflect current operating practice, and the employer to certify annually that they are current and accurate.
Source: 29 CFR 1910.119(f)(3) (eCFR)Under 29 CFR 1910.119(l)(5), when a managed change to a covered process changes the operating procedures or practices, those procedures or practices must be updated accordingly.
Source: 29 CFR 1910.119(l)(5) (eCFR)29 CFR 1910.119(h)(3)(iii) requires a contract employer to document that each contract employee received and understood the required training, in a record with the employee's identity, the date of training and the means used to verify understanding.
Source: 29 CFR 1910.119(h)(3)(iii) (eCFR)For FAA production approval holders, 14 CFR 21.137(b) requires procedures for controlling quality system documents and data and their changes, so that only current, correct and approved documents and data are used.
Source: 14 CFR 21.137(b) (eCFR)For FDA-regulated electronic records, 21 CFR 11.10(e) requires secure, computer-generated, time-stamped audit trails that record the date and time of entries and actions that create, modify or delete records, without obscuring what was recorded before.
Source: 21 CFR 11.10(e) (eCFR)