Machined aluminium bracket clamped in a fixture on a granite surface plate, with a coordinate measuring machine probe above it and an engineering drawing beside it
    First Article Inspection

    First article inspection software

    For quality managers who still build first article reports by retyping drawings and CMM printouts into spreadsheets. Agnotic Technologies builds first article inspection software that balloons the drawing, imports measured results and fills the AS9102 forms from your own data, with a quality engineer signing every report.

    Ballooned from the released drawingCMM results importedAS9102 Forms 1, 2 and 3Engineer review and sign-off

    Trusted by global innovators

    Benchmark
    Chibasco
    Fundency
    Lantimer
    Lera
    One Minute
    Pento Pix
    TAP
    Xtrium
    Benchmark
    Chibasco
    Fundency
    Lantimer
    Lera
    One Minute
    Pento Pix
    TAP
    Xtrium
    Benchmark
    Chibasco
    Fundency
    Lantimer
    Lera
    One Minute
    Pento Pix
    TAP
    Xtrium
    Benchmark
    Chibasco
    Fundency
    Lantimer
    Lera
    One Minute
    Pento Pix
    TAP
    Xtrium

    From drawing to signed report

    How do we automate first article inspection reports?

    First article inspection reports are automated by building them from data you already hold instead of typing them. First article inspection software reads the released drawing and balloons each characteristic, pulls the part number, revision and material details from your ERP or PLM, imports measured values from CMM and gauge result files, and fills AS9102 Forms 1, 2 and 3 from that data. Inspectors enter only the results no machine recorded, a quality engineer reviews every out-of-tolerance value and signs the report, and a new drawing revision shows which characteristics need a partial FAI.

    Agnotic Technologies builds this as custom manufacturing software around your drawings, measuring equipment and customer requirements. It runs alongside the ERP, PLM and quality systems you already have, not in place of them.

    What goes into an AS9102 first article report?

    An AS9102 first article report is built on three forms: Form 1 for part number accountability, Form 2 for product accountability and Form 3 for characteristic accountability. Your customer's contract decides which form version and which extra fields they expect.

    The software keeps everything the forms draw on in one record per first article: the part number and drawing revision, the sub-assemblies, the materials, special processes and their certificates, and every ballooned characteristic with its requirement, result and the gauge used. Each form is generated from that record, so a value is entered once and appears wherever it belongs.

    How do ballooned drawings and CMM results get into the report?

    The drawing is read first. For native PDF drawings or 3D models with product manufacturing information, the software proposes a balloon for each dimension, tolerance and note; a quality engineer checks the list, adds anything missed and fixes the numbering before it is used.

    Measured values then come from files, not from typing. The software reads the result files your CMM software exports, matches each result to its balloon number and marks any value outside tolerance. Hand-gauge readings are entered against the balloon, with the gauge ID checked against your calibration management software so an overdue gauge is caught before the result is accepted.

    1. Load the released drawing revision from PLM or the document system.
    2. Review the proposed balloons and confirm the characteristic list.
    3. Import CMM results and enter hand-gauge readings against each balloon.
    4. Review every out-of-tolerance result and raise a nonconformance where needed.
    5. Sign the report and send it to the customer in the format they ask for.

    When do we need a partial FAI instead of a full one?

    You need a partial FAI when your quality procedure or customer contract names a change that affects only some characteristics, such as a new drawing revision, a new supplier or special process, or a change of tooling or production location. A full FAI is repeated when the change affects the whole part or the procedure calls for one.

    The software compares the new drawing revision with the one the last FAI was built on and lists the characteristics that changed. The quality engineer confirms the scope, and the partial report keeps a link to the previous full report, so the history of the part reads in one place.

    Nonconforming results go straight into CAPA and NCR management software, so the FAI and the corrective action share one record.

    Architecture

    What do we build into first article inspection software?

    The components of a custom build, what each one does and the technology we typically use. The exact stack follows your systems and hosting rules.

    ComponentPurposeTypical tech
    Drawing intake and ballooningReads the released drawing and proposes a numbered balloon for each characteristicPDF and 3D model readers, AI-assisted extraction, a review screen for the engineer
    Characteristic registerHolds each characteristic with its requirement, tolerance, method and gauge, per drawing revisionPostgreSQL, revision-linked records
    Measurement importReads CMM and gauge results and matches them to balloon numbersParsers for CMM result exports, gauge interfaces, tolerance checks
    Report builderFills AS9102 Forms 1, 2 and 3 and exports the customer's formatForm templates, PDF and spreadsheet export
    Revision compareLists the characteristics that changed between drawing revisions for a partial FAICharacteristic diff, rules from your quality procedure
    Review and sign-offRecords the engineer's decision on each result and the signed reportElectronic signatures, time-stamped audit trail
    Integration layerPulls parts, revisions and lots in; sends results to quality and supplier systemsREST APIs, ERP, PLM and QMS connectors

    Hosting can be in your cloud account or on premises. Drawings and inspection records stay in storage you control.

    Rollout

    How does a first article rollout run?

    Five steps from the scoping call to first article reports built from data, one part family at a time.

    1. Scoping call

      We look at your drawings, measuring equipment, current FAI forms and customer requirements, and agree on a first part family.

    2. Map characteristics and forms

      We agree how balloons are numbered, which fields come from ERP or PLM and which customer form versions you need.

    3. Connect drawings and measurement

      Drawing intake, CMM result import and the gauge check against calibration records are built and tested on real parts.

    4. Pilot on live first articles

      New first articles run through the software while the spreadsheet stays as a fallback, and the two reports are compared.

    5. Extend to suppliers and families

      More part families follow, and suppliers can submit their first article data against the same characteristic list.

    Failure points

    Where first article reports go wrong

    Problems we see when first article reports are built by hand, and what the software changes.

    Challenge

    A characteristic is missed when the drawing is typed into a spreadsheet.

    Agnotic approach

    Balloons come from the released drawing, and the report count is checked against the characteristic list.

    Challenge

    CMM printouts are retyped, and a value lands on the wrong line.

    Agnotic approach

    Results are imported from the CMM file and matched to their balloon number.

    Challenge

    The report is built against an old drawing revision.

    Agnotic approach

    Each report is tied to a drawing revision from PLM, and a newer revision is flagged before sign-off.

    Challenge

    A gauge past its calibration date is used on a characteristic.

    Agnotic approach

    The gauge ID is recorded per result and checked against calibration records.

    Challenge

    A full FAI is repeated after a small change.

    Agnotic approach

    The revision compare lists only the changed characteristics for a partial FAI.

    Challenge

    Supplier first articles arrive as PDFs in email.

    Agnotic approach

    Suppliers submit results against the same characteristic list, through a supplier portal.

    Systems it connects to

    First article reports are faster and safer when the data comes from the systems that already own it.

    CMM software and gauges

    Result files from coordinate measuring machines and readings from digital hand gauges.

    PLM and drawings

    Released drawings, 3D models and engineering changes that start a new or partial FAI.

    ERP

    Part numbers, work orders, material lots and supplier details, such as from SAP or another ERP.

    QMS and NCR

    Nonconformances raised from out-of-tolerance results, linked to corrective actions.

    Calibration records

    Gauge IDs and due dates, so only gauges in calibration are accepted.

    Supplier portal

    Supplier first articles submitted against your characteristic list instead of by email.

    Who it is for

    Who is it for?

    Manufacturers whose customers ask for a first article report before production parts ship.

    Aerospace machine shops

    Suppliers to aircraft and engine makers who deliver AS9102 reports with first parts.

    Aerospace and defense primes

    Quality teams receiving and reviewing first article reports from many suppliers.

    Contract manufacturers

    Shops that build to customer drawings and meet several customers' report formats.

    Automotive suppliers

    Dimensional results gathered once and reused for customer submissions.

    Tool and mold makers

    First parts from new or repaired tools measured and reported against the drawing.

    What decides the size of the build?

    The size of a first article inspection build follows the number of part families, how many characteristics a typical drawing carries, the drawing formats (scanned, native PDF or 3D model), the CMM software and gauges in use, the customer form versions you deliver and the systems it connects to. We do not publish prices; the first release is scoped on the scoping call.

    Most teams start with one part family and one customer format, then add supplier submissions. For supplier approvals, scorecards and audits around the first article, see supplier quality management software.

    Facts and sources

    Which rules shape first article inspection records?

    FAA production quality system requirements for production approval holders, each linked to the regulation text on eCFR. Customer contracts may also call for AS9102.

    • Under 14 CFR 21.137, each FAA production certificate applicant or holder must describe in writing a quality system that includes procedures for inspections and tests used to ensure that each product and article conforms to its approved design.

      Source: 14 CFR 21.137(e) (eCFR)
    • 14 CFR 21.137(a) requires production approval holders to have procedures for controlling design data and subsequent changes, so that only current, correct and approved data is used.

      Source: 14 CFR 21.137(a) (eCFR)
    • 14 CFR 21.137(f) requires procedures for the calibration and control of all inspection, measuring and test equipment used to determine conformity to the approved design, with each calibration standard traceable to a standard acceptable to the FAA.

      Source: 14 CFR 21.137(f) (eCFR)
    • 14 CFR 21.137(c) requires supplier control procedures that ensure each supplier-provided product, article or service conforms to the production approval holder's requirements.

      Source: 14 CFR 21.137(c) (eCFR)
    • 14 CFR 21.137(k) requires procedures for identifying, storing, protecting, retrieving and retaining quality records, kept for at least 5 years for products and articles made under the approval and at least 10 years for identified critical components.

      Source: 14 CFR 21.137(k) (eCFR)

    Standards

    Standards the records support

    AS9102AS910014 CFR 21.137ASME Y14.5ISO 9001

    Frequently asked questions

    Build the report from data instead of typing it. Balloon the released drawing, take part and material details from ERP or PLM, import CMM and gauge results against each balloon, and let the software fill AS9102 Forms 1, 2 and 3. A quality engineer reviews out-of-tolerance results and signs the report.