A blood pressure cuff, a weekly pill organizer, a stopwatch and a blank monthly calendar sheet on a pale desk
    Software we build

    APCM billing software for Advanced Primary Care Management

    Advanced Primary Care Management pays per calendar month with no minutes to count, but it still asks a practice to place every patient in the right level, prove consent and keep other care management claims out of the same month. Agnotic Technologies builds that logic into your EHR or care management software, to your requirements.

    Last reviewed by the Agnotic Technologies engineering team

    What does APCM billing software need to do?

    APCM billing software runs Advanced Primary Care Management, HCPCS G0556, G0557 and G0558, as a monthly service with no minutes to count. It assigns each patient a level from chronic conditions and QMB status, records consent and the service elements, and holds back conflicting claims. Agnotic Technologies builds this logic into your EHR or care management platform.

    Where do practices get stuck with APCM?

    The codes are simpler than CCM on paper. The trouble starts when a practice tries to run them on software built for timed programs.

    1. Timers built for CCM, not for APCM

      Care management tools count minutes toward a threshold. APCM has no threshold, so a timer that blocks the claim until 20 minutes are logged stops valid APCM months.

    2. Levels set once and never revisited

      A patient enrolled at Level 1 adds a second chronic condition, or gains or loses QMB status, and the claim keeps going out at the old level.

    3. QMB status unknown at billing time

      Level 3 depends on Qualified Medicare Beneficiary status, which lives in Medicare eligibility data, not in the chart. Practices that cannot see it default to Level 2.

    4. Consent that cannot be found

      The patient must be told that only one practitioner can bill the service each month, that they can stop at any time and that cost sharing may apply. A verbal yes with no record does not hold up.

    5. Two care management claims in one month

      The same practitioner bills APCM and also CCM, PCM, TCM or an e-visit for that patient in the same month, and one of the claims should never have gone out.

    6. No proof of the service without minutes

      With no time log, the record of what the care team actually did each month is the only evidence. Many systems keep it in free text nobody can report on.

    What do we build for APCM?

    Agnotic Technologies builds APCM features into the EHR, care management platform or billing system you already run, or as a separate service beside them. These are the features we typically build, shaped to your workflow.

    • Level assignment from the problem list

      Rules that count active chronic conditions and read QMB status, propose G0556, G0557 or G0558 each month and show the clinician why.

    • QMB status from eligibility checks

      Medicare eligibility responses (X12 270/271) parsed for QMB status and stored with the month they were checked, so Level 3 rests on data.

    • Consent capture and stop requests

      A consent record with the four points the code descriptor lists, and a stop request that ends billing at the end of the calendar month.

    • Monthly APCM claim builder

      One claim per patient per calendar month for the practitioner who holds the care management role, built without any minute threshold.

    • Same-month conflict edits

      Edits that hold CCM, PCM, TCM, virtual check-in, e-visit and interprofessional consultation claims from the APCM practitioner in an APCM month, while allowing other practitioners' claims.

    • Service element evidence log

      Structured entries for care plan updates, transition follow-ups, secure messages and coordination calls, so each billed month has a record behind it.

    • Behavioral health add-on handling

      Support for the CY 2026 add-on codes G0568, G0569 and G0570, attached only when the same practitioner bills an APCM base code that month.

    • Population and gap reports

      Risk stratification and care gap lists across the APCM panel, which the service elements ask the practice to maintain.

    Which APCM level applies to each patient?

    The level follows the patient's chronic conditions and QMB status, not the time spent. The table shows the data the software needs for each level and the evidence worth keeping every month.

    CMS points practices to the Medicare HETS 270/271 eligibility transaction, and to the remittance advice, to see QMB status. We build the check to run before each claim month, so a lapse moves the patient to Level 2 instead of producing a wrong Level 3 claim.

    APCM levels with patient criteria, the data software needs to assign them and the evidence kept each month
    Level and codePatient criteriaData the software needsEvidence kept each month
    Level 1, G0556One chronic condition or fewer, expected to last at least 12 months or until death and placing the patient at significant riskActive problem list, consent record, initiating visit dateConsent on file, the service elements furnished that month, care plan updates where clinically relevant
    Level 2, G0557Two or more such chronic conditionsCount of qualifying active conditions, consent record, initiating visit dateAs Level 1, plus the condition list used to set the level that month
    Level 3, G0558A Qualified Medicare Beneficiary with two or more such chronic conditionsQMB status from a Medicare eligibility check, condition count, consent recordAs Level 2, plus the eligibility response that showed QMB status for that month

    How is APCM billed differently from CCM and PCM?

    APCM is billed once per calendar month by the one practitioner who takes on the care management role for that patient. Its code descriptors name no minimum time, so the claim does not wait for a timer.

    CCM and PCM still run on time thresholds. A practice that offers both models needs software that knows which model each patient is on in a given month. For the timed programs, see our comparison of PCM vs CCM care management codes.

    Not every element has to happen every month. A patient with no hospital stay that month needs no transition follow-up, but the practice must be able to furnish every element whenever the patient needs it.

    Practices billing APCM also report the Value in Primary Care MIPS Value Pathway, so quality reporting belongs in the same build plan.

    Which service elements must the practice be able to provide?

    The code descriptors list the elements below. Each one turns into a feature or a record in the software.

    Consent

    Tell the patient about the service, the one-practitioner rule, the right to stop and cost sharing, and document that consent was obtained.

    Initiating visit

    A qualifying visit starts the service for new patients and for patients not seen within 3 years.

    24/7 access and continuity

    A way to reach the care team for urgent needs at any hour, and a designated team member for routine follow-up appointments.

    Comprehensive care management

    Systematic medical and psychosocial needs assessment, preventive service tracking and medication reconciliation.

    Electronic care plan

    A patient-centered care plan the team can update, shared inside and outside the practice and given to the patient. Our CCM care plan guide maps its sections to FHIR R4.

    Care transitions

    Follow-up after an emergency visit or discharge, within 7 calendar days of discharge as clinically indicated, with timely exchange of health information.

    Enhanced communication

    Secure messaging, portal access, virtual check-ins and e-visits so the patient can reach the team between visits.

    Population-level management

    Analyze panel data for care gaps and risk stratify patients by diagnoses, claims or other electronic data.

    Performance measurement

    Assessment on primary care quality, total cost of care and use of certified EHR technology.

    Where does APCM software fail?

    These are the failure points we design against when we add APCM to a care management or billing system.

    • Level drift: the level stays fixed after a new chronic diagnosis, a resolved condition or a change in QMB status.
    • QMB status assumed: Level 3 billed from an old eligibility response, or Level 2 billed because nobody checked.
    • Missing consent: the service starts before consent is documented, or the record lacks the one-practitioner and cost sharing notice.
    • Stop requests ignored: a patient stops the service but billing continues past the end of that calendar month.
    • Same-practitioner conflicts: CCM, PCM or TCM from the APCM practitioner goes out in the same month.
    • Over-blocking: edits that stop a specialist's TCM claim, which another practitioner may bill in the same month.
    • Timers left switched on: APCM months held back because a CCM-style minute threshold was copied into the rule set.
    • No initiating visit: a new patient, or one not seen in 3 years, enrolled without the qualifying visit.

    What changed for APCM in CY 2026?

    The CY 2026 Physician Fee Schedule final rule added three behavioral health add-on codes for APCM: G0568 and G0569 for psychiatric collaborative care and G0570 for general behavioral health integration. They are billed only with an APCM base code from the same practitioner in the same month, and they do not require counting minutes.

    Rural health clinics and FQHCs bill APCM with the same three G-codes, paid in addition to the otherwise billable visit, as the CY 2026 rule restates.

    The CY 2027 proposed rule, published in July 2026, asks for comment on whether a different APCM payment structure would work better. Nothing in it is final, so we keep the level and conflict rules configurable rather than hard-coded.

    How does Agnotic build APCM into your software?

    If a care manager already works a CCM queue, an AI chronic care manager agent can prepare the monthly review while staff make the decisions.

    1. Map where the problem list, eligibility responses, consent and care plan live today, and which system sends the claim.

    2. Write the level, consent and same-month conflict rules as configuration your billing team can review, not as code buried in the claim builder.

    3. Build the features into your care management software or billing system, with the eligibility check through your X12 EDI integration.

    4. Test each rule against past months of your own data before the first APCM claim goes out, then review rejections and denials with your billing team.

    Facts and sources

    What do the fee schedule rules say?

    Each fact is from the Physician Fee Schedule rule text published in the Federal Register, read on govinfo.gov.

    Trusted by global innovators

    Benchmark
    Chibasco
    Fundency
    Lantimer
    Lauren
    Lera
    One Minute
    Pento Pix
    TAP
    Xtrium
    Healthevolve
    Benchmark
    Chibasco
    Fundency
    Lantimer
    Lauren
    Lera
    One Minute
    Pento Pix
    TAP
    Xtrium
    Healthevolve
    Benchmark
    Chibasco
    Fundency
    Lantimer
    Lauren
    Lera
    One Minute
    Pento Pix
    TAP
    Xtrium
    Healthevolve
    Benchmark
    Chibasco
    Fundency
    Lantimer
    Lauren
    Lera
    One Minute
    Pento Pix
    TAP
    Xtrium
    Healthevolve

    Which standards does Agnotic build healthcare software against?

    01HIPAA logo

    HIPAA

    Health Insurance Portability and Accountability Act

    Protect PHI with privacy-first architecture, encrypted storage and transmission, strict access controls, and traceable audit logs.

    02GDPR logo

    GDPR

    General Data Protection Regulation

    Implement lawful consent flows, data minimization, retention controls, and secure processing for sensitive health data.

    03FHIR logo

    FHIR

    Fast Healthcare Interoperability Resources

    Enable standardized health data exchange across apps, care teams, and systems through standards-based FHIR APIs.

    04HL7 logo

    HL7

    Health Level Seven International

    Support enterprise-grade interoperability with HL7-based integrations for records, events, and clinical messaging workflows.

    05HITRUST logo

    HITRUST

    Health Information Trust Alliance

    Align security programs to healthcare-specific control and risk management practices trusted by providers and ecosystem partners.

    06HITECH logo

    HITECH

    Health Information Technology for Economic and Clinical Health Act

    Design with breach notification readiness, digital record safeguards, and operational controls that support regulated care programs.

    07SaMD logo

    SaMD

    FDA Software as a Medical Device

    Plan software quality, traceability, and documentation pathways for products that may require SaMD review and submission.

    08MDR (EU) logo

    MDR (EU)

    Medical Device Regulation (European Union)

    Prepare EU market-ready processes for risk classification, evidence tracking, and lifecycle governance under MDR expectations.

    09SAMHSA logo

    SAMHSA

    Substance Abuse and Mental Health Services Administration

    Apply confidentiality controls and consent-aware sharing models for behavioral and mental health data experiences.

    Frequently Asked Questions

    No. The APCM code descriptors set no minimum time for the month. The practice documents the care it furnished in the medical record instead, which is why the software needs a structured record of each service element.