    Preventive Maintenance in Hospitals for NABH: Asset Register, PM Schedules and Calibration Evidence

    By GauravNovember 26, 20269 mins read
    On this page

    Biomedical teams in Indian hospitals usually do the maintenance work. What goes missing is the proof: a calibration certificate sitting in a vendor's inbox, a PM sticker with no record behind it, a ventilator that was out of service with no log of when the ward reported it. NABH assessors look for that proof, device by device.

    This post covers the records and software behind preventive maintenance for NABH: the asset register, PM schedules by equipment type, calibration records, breakdown and downtime logs, recall handling, vendor contracts and the evidence pack an assessor will sample.

    What does NABH expect from hospital preventive maintenance?

    Struggling to find equipment when PM is due?

    Our RFID in hospitals page covers tagging and locating clinical equipment across wards.

    NABH expects hospital preventive maintenance to run as a documented programme: every medical device on an inventory, a written preventive and breakdown maintenance plan that is followed, periodic inspection and calibration, and records that prove each step. Agnotic Technologies builds the registers and workflows that let biomedical teams show that proof device by device.

    NABH's hospital accreditation standards (6th edition, effective 1 January 2025) require a programme for medical equipment management under standard FMS.5: equipment is inventoried with logs, a documented preventive and breakdown maintenance plan is implemented, equipment is periodically inspected and calibrated, and qualified, trained personnel operate and maintain it.

    How should the asset register be set up?

    Set up the register so every medical device has one record with a unique asset number, its location and the details needed to plan and prove its maintenance. Build it from a physical walk-through of every floor, not the purchase ledger, because ledgers miss donated, loaned and demonstration equipment.

    • Identity: asset number on a durable tag, make, model, serial number and installation date.
    • Place: department, ward or room, and the person in charge of that area.
    • Risk class: critical, such as ventilators and defibrillators, or routine, which sets PM frequency and repair priority.
    • Service: vendor, warranty end date, maintenance contract and its renewal date.
    • Status: in use, under repair, on standby or condemned.

    Tag numbers should be readable by barcode or RFID, so a technician can open the right record while standing at the device.

    Which maintenance tasks should the plan cover?

    The plan should cover inspection, preventive work and repair, because each produces a different record and answers a different question.

    WHO's Medical equipment maintenance programme overview describes a maintenance strategy as inspection plus preventive and corrective maintenance: performance inspections confirm equipment operates correctly, safety inspections confirm it is safe for patients and operators, and preventive maintenance aims to extend equipment life and reduce failure rates.

    Keep the performance check, the safety check and the preventive tasks as separate parts of the PM checklist, so a reviewer can see each was done. After every repair, require a performance and safety check before the device goes back to the ward.

    How should PM frequency be decided?

    Decide PM frequency by equipment type and risk class, starting from the manufacturer's recommended interval and recording the reason for any change. One annual visit for every device is easy to plan but leaves critical equipment checked no more often than a weighing scale.

    Write one checklist per equipment type so every visit records the same steps, the readings taken and the parts replaced. A PM visit without a completed checklist should not be allowed to close in the system.

    How is calibration recorded?

    Record calibration on each device's record with the date, the readings before and after adjustment, the reference instrument or laboratory used, the certificate number and the next due date. Attach the certificate itself to the device record rather than filing it elsewhere.

    • Due list: devices due for calibration in the coming weeks, grouped by department.
    • Certificates: received from the vendor or calibration lab and linked to the device and the visit.
    • Labels: a sticker on the device with the last and next dates, matching the record exactly.
    • Out of tolerance: a failed calibration opens a work order and, where readings may have affected care, a review with the department.

    Breakdowns and downtime for critical equipment

    Every breakdown should be logged when the ward reports it, not when the technician arrives, so downtime is measured from the moment care was affected.

    NABH standard FMS.5 also asks hospitals to monitor medical equipment and devices for adverse events, comply with hazard notices on recalls, and monitor downtime for critical equipment breakdowns from reporting through inspection to corrective action.

    Capture the time reported, time inspected, cause, parts awaited, vendor visit and time returned to service. For critical equipment, show the department whether a standby unit is available while the device is down.

    Recall notices and device incidents

    Link every recall or hazard notice to the affected devices by make, model and serial number, record the action taken on each, and close the notice only when every listed device has been checked. Incidents reported by wards belong on the same device record, so a pattern across units is visible.

    How should AMC and CMC contracts be tracked?

    Track each annual maintenance contract (AMC) or comprehensive maintenance contract (CMC) against the devices it covers, with the PM visits it includes, its response terms and its end date. A lapsed contract is a common reason planned visits quietly stop.

    • Coverage: which devices and parts are included, and whether calibration is part of it.
    • Visits: PM visits promised under the contract, matched to completed service reports.
    • Renewal: alerts to the purchase and biomedical teams well before the end date.
    • Service reports: each one attached to the device record with the engineer's name.

    Training, replacement and condemnation

    Keep a record of who is trained on each equipment type, users as well as technicians, with the date and the trainer. Ward staff usually notice a fault first, so their training deserves the same record as the engineer's.

    When a device is beyond economical repair or no longer supported by its maker, record the decision and who approved it, remove any patient data stored on it, and mark it condemned so it drops out of PM schedules.

    What evidence will an assessor want to see?

    Prepare evidence that lets anyone pick a device at random and trace it from its tag to its register entry, PM history, calibration certificate, breakdown log and the training of its users.

    • Programme document: scope, roles, PM and calibration policy, and the condemnation procedure.
    • Register extract: complete, current and matching the tags on the devices.
    • PM compliance: planned against completed visits, by department and month.
    • Downtime report: critical equipment breakdowns from report to return to service, with corrective actions.
    • Recall log: notices received, devices affected and actions closed.

    What goes wrong with NABH maintenance records?

    Most gaps come from records that drift away from the equipment they describe. These patterns recur.

    • Register drift: devices moved between wards with no update, so PM teams cannot find them.
    • Certificates held elsewhere: calibration done, but the certificate sits in a vendor's folder.
    • Stickers without records: a PM label on the device and no completed checklist behind it.
    • Late breakdown logs: downtime starts when the engineer arrives rather than when the ward called.
    • Lapsed contracts: an AMC ends and its planned visits stop without anyone noticing.

    A worked example: preparing for a first NABH assessment

    A multi-specialty hospital kept equipment lists in spreadsheets maintained by each department, while calibration certificates stayed with vendors. Before applying for accreditation, the biomedical team walked every floor, tagged each device and built one register with risk classes.

    PM checklists were written per equipment type, contract terms were loaded against devices, and wards began logging breakdowns from a phone at the bedside. Vendors were asked for every certificate, and each was attached to its device record.

    The quality team then ran mock audits, picking devices at random and tracing each from tag to certificate, and fixed the gaps they found.

    Who owns what?

    Biomedical engineering owns the programme, but it depends on wards, quality and purchase doing their parts.

    • Biomedical engineering: register, PM plan, calibration, repairs and vendor coordination.
    • Department in-charges: reporting breakdowns promptly and releasing devices for PM.
    • Quality team: mock audits, evidence pack and corrective actions.
    • Purchase: contracts, renewals and replacement orders.

    How do you measure the programme?

    Measure whether planned work happens on time and whether critical equipment is available when wards need it.

    • PM completion against plan, by department and month.
    • Devices overdue for calibration, with days overdue.
    • Downtime of critical equipment, from report to return to service.
    • Open recall actions and register accuracy from spot checks.

    What are preventive maintenance best practices for NABH hospitals?

    Build the register from a physical walk-through, set PM frequency by risk, keep checklists per equipment type, attach every certificate and service report to its device, and log breakdowns from the moment the ward reports them.

    Track contracts against devices, record user training, run mock audits by sampling devices at random, and review downtime of critical equipment with department heads every month.

    How Agnotic can help

    Agnotic builds maintenance systems for hospitals: asset registers with barcode or RFID tags, PM and calibration scheduling, bedside breakdown logging, contract tracking and the reports a quality team needs for NABH evidence.

    Build your hospital asset and maintenance system with Agnotic

    Our hospital asset management solution page covers registers, PM schedules and maintenance workflows we build.

    Sources

    Frequently Asked Questions

    In the 6th edition hospital standards, FMS.5 covers the medical equipment management programme: inventory, preventive and breakdown maintenance, calibration, trained staff, replacement and downtime monitoring.